WAPDA New Connection Cost Estimator
Enter all costs of a new electricity connection in one worksheet — demand notice, security deposit, meter, cable and service line — and get the total estimate.
How to use
- Enter your sanctioned load in kW — the security deposit will be calculated automatically from it.
- Adjust the demand notice, meter, cable (length x rate), service line and inspection charges according to your DISCO estimate.
- See the total estimate below with a breakdown of each item.
This is an itemised worksheet, not a live official fee lookup: the real demand notice is issued by your DISCO (LESCO, IESCO, MEPCO etc.) after a survey and based on your load, and in remote areas the service line cost can be much higher. Rates change — verify with the official source before relying on this. All rate fields on this page are editable estimates prefilled with commonly published values, not a live official lookup.
Frequently Asked Questions (FAQ)
What costs does the worksheet include?
Sanctioned load in kW, security deposit per kW, demand notice or application fee, meter cost, service cable length and rate, service line or pole share charges, wiring test or inspection, and miscellaneous.
How is the security deposit calculated?
The deposit is calculated automatically from your sanctioned load in kW multiplied by the deposit rate per kW. You can edit the rate to match your DISCO.
Are these the official fees?
No. This is an itemised worksheet, not a live official fee lookup. The real demand notice is issued by your DISCO after a survey, and rates change, so verify with the official source.
Can I change the prefilled rates?
Yes. Every rate field is editable, and the total with a full breakdown updates instantly.
Are electrician labor charges included in the estimate?
The worksheet has a field for the wiring test report or inspection fee. Electrician labor and house wiring material are separate costs you would add yourself.